Rambler's Top100
home SFP-Engineering
SECURITY &
FIRE PROTECTION ENGINEERING
rus eng (495) 543-86-10
write a letter print version site map
ommissioning

©2006-17 SFP Engineering

With end of installation of system of safety get necessary integrity. But the final testing the safety capable in time to reveal and eliminate arisen complexity is required. Our experts carefully and captiously check working capacity of each element separately and all system as a whole.

 

After that we make out the certificate of acceptance of systems at participation of representatives of state supervision. For this purpose all volume of the necessary documentation is prepared and will be coordinated: reports, schemes and drawings, information on results of the lead examinations and tests, the information on technical parameters of the installed systems.

 

Usually within the limits of starting-up and adjustment works tests of electric systems are spent, and the minor attention is paid to mechanical elements. Our company spends full inspection of working capacity of system. We understand: in a safety there can not be trifles.

 

At will of the Customer our experts will lead detailed instructing, explaining to an opportunity of the installed systems and those conditions which are necessary for reliable work in an on duty mode. Payment of week training of two employees of your personnel is included in cost of starting-up and adjustment works.

 

SFP Engineering guarantees, that the object will be entered in build in full conformity with all specifications, instructions and individual requirements of the Customer.